Quick Answer
For a home in Atherton's class, the interviewed integrator puts whole-home automation at about $200K–$300K; larger estates can reach $2M–$3M. In the 1999 house featured in the video, with the walls left closed, the core work took about two to three weeks. Opening walls to rewire and finish everything properly, in the integrator's judgment, cannot be done in that time.
That is the substance of a November 2026 interview by MK Group co-founder Marie Wang (YouTube @MarieWang, 44K+ subscribers). Her guest is Ariel, founder of Bay Area smart-home integrator MonaSmart. The house under discussion belongs to a friend of Marie's in Atherton: built in 1999, two stories, more than 6,000 sq ft inside, with every system still original.
Who this article is for
- Owners who have bought, or live in, a large home from around the 1990s in Atherton, Palo Alto or Los Altos Hills, and want lighting, security, the gate, climate control and the pool on a single system
- Families holding quotes from several integrators who want to understand how opening the walls, or leaving them closed, changes the price, the timeline and the result
- Owners who plan to tear down and rebuild in a few years and simply want the existing house to run smoothly in the meantime
Three core dimensions
Dimension one: whether existing equipment can be brought in decides between integrating and replacing
The usual state of an older estate is that every system runs on its own. Before the retrofit, the waterfall and spa, the climate control, the lighting, the gate, the security system and the glass-break sensors in Marie's friend's house each had a separate app. Worse, they fell out of sync. In one example from the video, an owner found the gate closed while the app reported it open. Whoever installed the original system had never truly integrated the gate, so its status could not update.
The integrator starts by checking the condition of each device before deciding how to connect it. Where the manufacturer offers an interface (what most people know as an API), the device connects directly. The rest come in through hardware or software integration, and equipment that is too old may not connect at all. The team mainly uses Control4 as the hub, which then bridges to Apple, Google and Alexa. Some devices that could not connect to Apple on their own end up controlled from the same system.
Dimension two: whether the walls come open decides between a wired, centralized system and a wireless one
Ariel says there are usually three approaches; the video goes into two of them. A wired, centralized system runs every lighting circuit in the house back to a single equipment room, and that room also has to be cooled. It is demanding to install. A wireless system keeps conventional 120V switches and circuits, and the devices talk to each other wirelessly. The team's Control4 setup uses Zigbee, which runs separately from the home's Wi-Fi, then connects to Apple, Google and Alexa on top. The system is also updated periodically.
This choice decides how clean the walls can look. Large homes often carry a row of five or six switches, which is not attractive. Replacing a whole row with one keypad requires centralized lighting wiring. With the existing 120V circuits kept, Marie's friend's house went from five- or six-gang switch banks to four-gang, which Ariel calls the limit. A new estate wired from the blueprint stage has far more room. For which details before the walls close determine the workmanship, see where the workmanship actually differs between a $30M and a $10M new Silicon Valley estate.
Dimension three: the move-in date and the long-term plan for the house decide how much to do now
With older homes, in Ariel's words, "anything can be retrofitted." (Translated from Mandarin.) What differs is difficulty, labor and budget. The budget turns on three things: product tier, the price of the system itself, and how much labor and installation complexity the job involves. How the house is used changes the list, too. In a home bought through a company, surveillance cameras have to be in place. For a family that entertains often, the sound system is a must.
The timeline depends on the starting point. An estate system taken from blueprints and wiring through to handover commonly takes one to two years, and three or four years is also seen, because once the integrator finishes its own scope, it still waits for the rest of the house to be completed. The core need in Marie's friend's case was to move in early, and the owners had mentioned they might rebuild later, so the team recommended a streamlined version. If the older house you own could be torn down within a few years, first weigh whether an Atherton acre should be judged as a home or as a tear-down, then decide how much to put into this retrofit.
The numbers: budget and timeline for whole-home automation in an older Atherton-class estate
The headline numbers: by the interviewed integrator's estimate, whole-home automation in an Atherton-class home typically runs $200K–$300K, and on larger estates, $2M–$3M projects are, by Ariel's account, not uncommon. An estate system built from blueprints commonly takes one to two years, with three to four also seen, while the occupied 1999 house in the video had its core work done in about two to three weeks without opening the walls.
| Item | Figure | Note |
|---|---|---|
| Whole-home automation, Atherton-class home | $200K–$300K | Typical market price, per the interviewed integrator |
| Larger estates | $2M–$3M | Not uncommon, per the integrator; the homes are also larger |
| Estate system built from blueprints | 1–2 years common; 3–4 years also seen | Once its own scope is done, the integrator waits for the whole house to be completed |
| The occupied house in the video (walls left closed) | About 2–3 weeks for the core work | Some high-end custom products were still on order at filming; not yet fully finished |
| The house in the video | Built 1999; two stories; 6,000+ sq ft interior | Original wiring; older 12V fixtures converted to 120V circuits |
| Switch banks (existing 120V wiring kept) | Five- or six-gang cut to four-gang | The integrator called this the limit |
Basis: these figures are the interviewed integrator's oral estimates of Bay Area industry ranges, not published statistics, and have not been independently verified. Actual quotes vary with home size, equipment tier and installation complexity. The video does not disclose what this house actually cost.
What to remember: read the price and the timeline together with the installation method. $200K–$300K is Ariel's typical market price for an Atherton-class home, not a quote for this house. Two to three weeks applies only when the walls stay closed; opening them and rewiring properly in that time is, in the integrator's judgment, out of the question. When a quote arrives, first ask which installation method it assumes, then compare the numbers.
The project in the interview: a 1999 Atherton house, core work done in two to three weeks with the walls left closed
MK Group's work centers on estates in Atherton, Palo Alto and Los Altos Hills. The house in this video belongs to a friend of Marie's, and the retrofit was carried out by the interviewed integrator's team. What follows is drawn from the interview.
Before. The video opens with an example: some families need 19 or 20 apps on their phones just to run the equipment at home. In a large house, leaving means switching lights off one by one, and coming home means switching them back on. Even with household staff to do it, the problem never goes away. The friend's wiring was all original, and some of the fixtures were very old 12V products.
Why the walls stayed closed. Another vendor's original proposal called for opening walls and promised a move-in within a very short time. After assessing the house, the team took the owners to see its other Atherton projects and concluded that opening walls and wiring everything properly in two or three weeks was out of the question. The final approach left the walls closed. Where a small hole would do, the team cut one and ran the wire from inside. In the few places that were very difficult yet essential, the wiring ran along the exterior wall, with the trim finished cleanly. Older 12V fixtures were converted to the 120V circuits now standard, and the line-voltage work was handled by two electrical crews licensed C-10. Marie guessed the job had taken only two or three weeks; Ariel confirmed it, saying the team calls this "Bay Area super speed." (Translated from Mandarin.) At filming, some high-end custom products were still on order, and the job was not yet fully finished.
After. Coming home, one touch turns on the lights, the shades and the music. The cameras run on the same system, the pool is being integrated, and landscape lighting will be added. A control panel in the house holds scenes set to the family's routines, each with its own set of linked devices, and some of the lights can change color.
The design principle. Ariel's standard is simple: a system passes only if a grandmother walking in for the first time can use it without trouble. However many features it has, the ones people use most come down to two or three. The feature that nearly every new build and retrofit includes is smart lighting, which large estates need most, with their many rooms and long distances. Features a family will not use are not recommended to show off or to raise the price.
Common Misconceptions
Misconception 1: "An older house can't take whole-home automation; you'd have to tear it down and start over"
Ariel's answer is that anything can be retrofitted. What differs is difficulty, labor and budget. The 1999 house in the video kept its existing wiring, with only adjustments and optimization, and still brought the lighting, shades, music and cameras onto one system.
Misconception 2: "For a house like this in Atherton, $100K-plus will cover whole-home automation"
In the video, Marie asked whether it takes $100K-plus. Ariel's answer: an Atherton-class home generally needs $200K–$300K, and $2M–$3M projects on larger estates are not uncommon. That is the integrator's range from experience; product tier, system pricing and installation complexity all move a quote up or down.
Misconception 3: "Open the walls, rewire, and we can still move in within two or three weeks"
What took two to three weeks in the video was the closed-wall approach: small holes to run wire, and exterior runs where necessary. To truly open walls, wire and finish everything, the team's judgment is that two or three weeks is out of the question. When opening walls and a short timeline are promised together, ask for the installation method and the schedule in writing first.
Misconception 4: "One keypad can replace a whole row of switches"
Replacing a row of switches with one keypad depends on centralized lighting wiring, which means the wired system with its equipment room and extensive cabling. With conventional 120V circuits kept, the only option is subtraction: a switch with two buttons on one plate, or smart lights that need no physical switch wiring. Even then, the reduction is modest. The house in the video went from five- or six-gang to four-gang, which Ariel calls the limit.
Next steps
- Start with a list of devices and apps. Write down the brand, model and approximate age of every system, so the integrator can judge which can connect through an interface, hardware or software, and which may be too old and need replacing.
- Fix the move-in date and the long-term plan before choosing an approach. If you need to move in soon or may rebuild within a few years, take the streamlined, closed-wall route. If you plan to stay for the long term and have a renovation window, then weigh a wired, centralized system.
- Ask for the quote in three parts. Product tier, system pricing, and labor and installation complexity should each be listed, and the installation method and timeline should be written into the contract.
- Check licenses and permits. Line-voltage electrical work falls to contractors holding a C-10 (Electrical) license, and low-voltage systems correspond to C-7 (Low Voltage Systems); license status can be checked on the Contractors State License Board (CSLB) website. Before work starts, confirm with your city's building department whether the electrical changes need a permit.
- Design around the two or three scenes you use most. Get coming home, leaving and entertaining right, along with smart lighting, and sign off with one test: could an older relative walking in for the first time use it right away?